Menyiapkan kuda-kuda. Genap empat bulan selepas pembersihan kawasan.
Delivery lorry.
Tingkat atas sudah siap plaster licin.
24 September, 2016
13 September, 2016
Dinding Tingkat Bawah.
Menyiapkan dinding tingkat bawah.
The porch, master bedroom (left) and kitchen (right).
Main entrance, main door, corner window.
Bedroom 1.
The porch, master bedroom (left) and kitchen (right).
Main entrance, main door, corner window.
Bedroom 1.
07 September, 2016
02 September, 2016
Site Visit 2nd Sept
Site visit 2 Sept 2016.
Formwork for first floor columns being constructed. Dilihat dari belakang. Viewed from the rear of the building. The kitchen. First floor (looking North).
Formwork for first floor columns being constructed. Dilihat dari belakang. Viewed from the rear of the building. The kitchen. First floor (looking North).