24 September, 2016

Kuda-kuda dan Bumbung

Menyiapkan kuda-kuda. Genap empat bulan selepas pembersihan kawasan.

Delivery lorry.
Tingkat atas sudah siap plaster licin.

13 September, 2016

Dinding Tingkat Bawah.

Menyiapkan dinding tingkat bawah.

The porch, master bedroom (left) and kitchen (right).
Main entrance, main door, corner window.
Bedroom 1.

07 September, 2016

Roof beam

Site visit by Architect and Engineer.

The engineer.
..and the architect (dark pants)

02 September, 2016

Site Visit 2nd Sept

Site visit 2 Sept 2016.

Formwork for first floor columns being constructed.
Dilihat dari belakang. Viewed from the rear of the building.
The kitchen.
First floor (looking North).